|
Jami's studio to the left, Jon's studio to the right, with the new poured floor That was the Construction of the Studio Extension tour. See also the Studio tour, the Jon at Work tour, the Mya Chair Process, and the November 2005 Open House tour. Go back to Jon's House / Tour Index. |